Full Text Release|Technical Regulations for Preparation of Geothermal Resources Development and Utilization Plan for Xiongan New Area (Trial)
geothermy2024-01-19t15:32:49+08:00"This service is sponsored by the title of Anhui Southland Cold and Heat Comprehensive Energy Co., Ltd (click for details) The company's main business scope is: regional centralized cooling and heating intelligent operation, energy Internet, building and industrial energy saving, data center cooling and emergency cold source construction, IC clean room, operating room laboratory purification engineering, central air-conditioning engineering, intelligent engineering, information technology system integration and other high-tech services. Title | Full Text Release | "Xiongan New Area Geothermal Resources Development and Utilization Program Preparation Technical Regulations (Trial)" Source | Geothermal Edit | Geothermal Small Core (add micro-signal: geothermalAI, can get relevant information) → This is the geothermal energy online AI Geothermal Small Core edited the 1st article on January 15, "Xiongan New Area Geothermal Resources Development and Utilization Program Preparation Technical Regulations (Trial)" ( hereinafter referred to as "Technical Regulations") was issued and implemented for a trial period of two years. The Technical Regulations clarify the working procedures for the preparation of the geothermal resources development and utilization plan for Xiongan New Area, and stipulate the requirements for the preparation of the construction plan, development plan, utilization plan, resources and environmental protection, safety production, investment estimation and technical and economic evaluation. The Technical Regulations include five chapters and three appendices, including scope, normative references, terms and definitions, general provisions and preparation contents and requirements. The procedure is applicable to the preparation of hydrothermal geothermal resources development and utilization program, and the preparation of medium and deep heat exchange and dry hot rock geothermal program can refer to this procedure. According to Geothermal Plus, the content and requirements of the geothermal resources development and utilization plan for Xiongan New Area specifically include overview, demand status and prediction, overview of geothermal resources, determination of the construction plan, geothermal resources development plan, geothermal resources utilization plan, resources and environmental protection, safety production, and brief conclusions, etc. The layout of geothermal wells is the basis for determining the construction plan. Geothermal well layout is one of the important contents of the construction program determination. According to the requirements of well layout, it mainly includes factors such as ecological red line, heat supply construction layout, production capacity and service life of single well, and sustainable utilization of geothermal resources. There shall be no less than two geothermal well distribution programs, including the distribution method of geothermal wells, the number of geothermal extraction wells, the number of geothermal recharge wells, and the plan distribution map of geothermal wells. A comprehensive analysis of no less than two well distribution schemes shall be conducted to finalize the recommended scheme. Geothermal tail water refers to the geothermal fluid with reduced temperature that is used to inject recharge wells or discharged into the environment after direct or indirect utilization. The geothermal tail water treatment plan should specify the construction of recharge wells and pump houses, the comprehensive utilization of tail water and treatment methods. At the same time need to clarify the recharge system of ground purification process and technical requirements, can not meet the direct discharge requirements of geothermal tail water, the development of geothermal tail water treatment program. The standard is under the Natural Resources and Planning Bureau of the Management Committee of Xiongan New Area of Hebei Province, and the main drafting units are Tianjin Geothermal Exploration and Development Design Institute, Tianjin University, China University of Geosciences (Beijing), Northwest University, Hebei University of Technology, Ecological and Environmental Geological Service Center of Henan Provincial Geological Bureau, China Xiongan Group Intelligent Energy Company Limited, Sinopec Green Energy Geothermal Energy Development Co. Ltd., North China Oilfield Branch of PetroChina Company Limited, Tianjin Energy Investment Group Company Limited, the Third Hydrological Engineering Geology Brigade of Hebei Geology and Mining Bureau, and Beijing Engineering Geology Research Institute. The main drafters of the standard are: Cheng Xiaojun, Zhang Gengshen, Lin Jianwang, Xu Bowen, Li Hongying, Ruan Chuanman, Liu Jie, Yu Dongdong, Jia Yuzhe, Liu Wenhui, Liu Fei, Dai Chuanshan, Zheng Xiuhua, Ren Zhaoli, Wang Huajun, Hou Huairen, Time Wei, Zheng Xiaofei, Liu Yang, Li Pengfei, Sun Lingliao, Hou Deren, Sun Caixia, Li Xun, Cong Peide, Li Bo, Zhu Ting, Shi Yuanyi, and Ma Jingchen.